{"id":996,"date":"2025-08-13T12:19:44","date_gmt":"2025-08-13T08:49:44","guid":{"rendered":"https:\/\/ehyairon.com\/en\/en\/?post_type=project&#038;p=996"},"modified":"2025-09-03T13:46:35","modified_gmt":"2025-09-03T10:16:35","slug":"construction-of-a-132-kv-communication-line-from-the-400-132-kv-khaf-substation-to-the-20-132-kv-dedicated-substation-of-sepahan-ihya-iron-ore-mines-company","status":"publish","type":"project","link":"https:\/\/ehyairon.com\/en\/project\/construction-of-a-132-kv-communication-line-from-the-400-132-kv-khaf-substation-to-the-20-132-kv-dedicated-substation-of-sepahan-ihya-iron-ore-mines-company\/","title":{"rendered":"Construction of a 132 kV communication line from the 400\/132 kV Khaf substation to the 20\/132 kV dedicated substation of Sepahan Ihya Iron Ore Mines Company."},"content":{"rendered":"<article class=\"text-token-text-primary w-full focus:outline-none scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]\" dir=\"auto\" tabindex=\"-1\" data-turn-id=\"request-WEB:2d2bbb15-5dde-42f6-8338-7ed8054a21b5-15\" data-testid=\"conversation-turn-26\" data-scroll-anchor=\"true\" data-turn=\"assistant\">\n<div class=\"text-base my-auto mx-auto pb-10 [--thread-content-margin:--spacing(4)] @[37rem]:[--thread-content-margin:--spacing(6)] @[72rem]:[--thread-content-margin:--spacing(16)] px-(--thread-content-margin)\">\n<div class=\"[--thread-content-max-width:32rem] @[34rem]:[--thread-content-max-width:40rem] @[64rem]:[--thread-content-max-width:48rem] mx-auto max-w-(--thread-content-max-width) flex-1 group\/turn-messages focus-visible:outline-hidden relative flex w-full min-w-0 flex-col agent-turn\" tabindex=\"-1\">\n<div class=\"flex max-w-full flex-col grow\">\n<div class=\"min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal [.text-message+&amp;]:mt-5\" dir=\"auto\" data-message-author-role=\"assistant\" data-message-id=\"755c53d8-be84-495e-8c42-832f283b8de9\" data-message-model-slug=\"gpt-5-mini\">\n<div class=\"flex w-full flex-col gap-1 empty:hidden first:pt-[3px]\">\n<div class=\"markdown prose dark:prose-invert w-full break-words dark markdown-new-styling\">\n<h3 data-start=\"0\" data-end=\"20\">Project Location<\/h3>\n<p data-start=\"22\" data-end=\"192\">Khorasan Razavi Province \u2013 spanning from the 400\/132 kV Khaf substation to the 20\/132 kV Ehya Sepahan dedicated substation, with an approximate length of 13 kilometers.<\/p>\n<p data-start=\"194\" data-end=\"346\">The strategic project involves connecting the 400\/132 kV Khaf substation to the 20\/132 kV dedicated substation of Ehya Sepahan Iron Ore Mines Company.<\/p>\n<p data-start=\"348\" data-end=\"556\">As one of the pioneers in the country\u2019s mining industry, Ehya Sepahan Iron Ore Mines Company has initiated this connection project to promote sustainable development and optimize the operation of its mines.<\/p>\n<p data-start=\"558\" data-end=\"819\" data-is-last-node=\"\" data-is-only-node=\"\">The project includes the construction of a 132 kV transmission line approximately 13 kilometers long, serving as a vital and strategic infrastructure to provide stable, reliable, and high-quality electricity for powering the company\u2019s extensive mining projects.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"flex min-h-[46px] justify-start\"><\/div>\n<div class=\"mt-3 w-full empty:hidden\">\n<div class=\"text-center\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<div class=\"pointer-events-none h-px w-px\" aria-hidden=\"true\" data-edge=\"true\"><\/div>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1023 size-medium\" src=\"https:\/\/ehyairon.com\/en\/wp-content\/uploads\/2025\/08\/Pictubvgregre4-227x300.jpg\" alt=\"\" width=\"227\" height=\"300\" srcset=\"https:\/\/ehyairon.com\/en\/wp-content\/uploads\/2025\/08\/Pictubvgregre4-227x300.jpg 227w, https:\/\/ehyairon.com\/en\/wp-content\/uploads\/2025\/08\/Pictubvgregre4.jpg 644w\" sizes=\"auto, (max-width: 227px) 100vw, 227px\" \/><\/p>\n<article class=\"text-token-text-primary w-full focus:outline-none scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]\" dir=\"auto\" tabindex=\"-1\" data-turn-id=\"request-WEB:2d2bbb15-5dde-42f6-8338-7ed8054a21b5-14\" data-testid=\"conversation-turn-24\" data-scroll-anchor=\"true\" data-turn=\"assistant\">\n<div class=\"text-base my-auto mx-auto pb-10 [--thread-content-margin:--spacing(4)] @[37rem]:[--thread-content-margin:--spacing(6)] @[72rem]:[--thread-content-margin:--spacing(16)] px-(--thread-content-margin)\">\n<div class=\"[--thread-content-max-width:32rem] @[34rem]:[--thread-content-max-width:40rem] @[64rem]:[--thread-content-max-width:48rem] mx-auto max-w-(--thread-content-max-width) flex-1 group\/turn-messages focus-visible:outline-hidden relative flex w-full min-w-0 flex-col agent-turn\" tabindex=\"-1\">\n<div class=\"flex max-w-full flex-col grow\">\n<div class=\"min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal [.text-message+&amp;]:mt-5\" dir=\"auto\" data-message-author-role=\"assistant\" data-message-id=\"c9ac7f1b-ed1d-4958-82fe-19227a4af5ef\" data-message-model-slug=\"gpt-5-mini\">\n<div class=\"flex w-full flex-col gap-1 empty:hidden first:pt-[3px]\">\n<div class=\"markdown prose dark:prose-invert w-full break-words dark markdown-new-styling\">\n<h3 data-start=\"0\" data-end=\"41\">Technical Significance of the Project<\/h3>\n<p data-start=\"43\" data-end=\"367\">The implementation of this transmission line significantly increases electricity transfer capacity and enables the simultaneous operation of multiple processing and mining projects. This measure reduces the likelihood of unexpected outages, improves the stability of the power network, and enhances operational efficiency.<\/p>\n<h3 data-start=\"369\" data-end=\"397\">Environmental Dimensions<\/h3>\n<p data-start=\"399\" data-end=\"762\">Through optimized design and execution of this transmission line, Ehya Sepahan is committed to minimizing environmental impacts and preserving the ecological balance of the region. The use of modern technologies and adherence to international environmental standards are integral parts of the company\u2019s broader plans for responsible and sustainable development.<\/p>\n<h3 data-start=\"764\" data-end=\"802\">Economic and Developmental Impacts<\/h3>\n<p data-start=\"804\" data-end=\"1160\" data-is-last-node=\"\" data-is-only-node=\"\">This project directly contributes to increased production capacity and job creation in the region, playing a key role in strengthening energy infrastructure and regional industrial development. Additionally, the provision of stable electricity reduces operational costs and enhances the company\u2019s competitiveness in both domestic and international markets.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"flex min-h-[46px] justify-start\"><\/div>\n<div class=\"mt-3 w-full empty:hidden\">\n<div class=\"text-center\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<div class=\"pointer-events-none h-px w-px\" aria-hidden=\"true\" data-edge=\"true\"><\/div>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1024 size-medium\" src=\"https:\/\/ehyairon.com\/en\/wp-content\/uploads\/2025\/08\/Pictuvfre3-230x300.jpg\" alt=\"\" width=\"230\" height=\"300\" srcset=\"https:\/\/ehyairon.com\/en\/wp-content\/uploads\/2025\/08\/Pictuvfre3-230x300.jpg 230w, https:\/\/ehyairon.com\/en\/wp-content\/uploads\/2025\/08\/Pictuvfre3.jpg 241w\" sizes=\"auto, (max-width: 230px) 100vw, 230px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1022 size-medium\" src=\"https:\/\/ehyairon.com\/en\/wp-content\/uploads\/2025\/08\/Pic12ture1-230x300.jpg\" alt=\"\" width=\"230\" height=\"300\" srcset=\"https:\/\/ehyairon.com\/en\/wp-content\/uploads\/2025\/08\/Pic12ture1-230x300.jpg 230w, https:\/\/ehyairon.com\/en\/wp-content\/uploads\/2025\/08\/Pic12ture1.jpg 251w\" sizes=\"auto, (max-width: 230px) 100vw, 230px\" \/><\/p>\n<h3 data-start=\"0\" data-end=\"114\">Specialized and Sustainable Implementation of Power Transmission Projects According to International Standards<\/h3>\n<ul data-start=\"116\" data-end=\"529\">\n<li data-start=\"116\" data-end=\"222\">\n<p data-start=\"118\" data-end=\"222\"><strong data-start=\"118\" data-end=\"165\">Provision and Installation of Key Equipment<\/strong> such as transmission towers and specialized conductors<\/p>\n<\/li>\n<li data-start=\"223\" data-end=\"343\">\n<p data-start=\"225\" data-end=\"343\"><strong data-start=\"225\" data-end=\"295\">Execution of Power Transmission Line Construction and Installation<\/strong> in strict compliance with technical standards<\/p>\n<\/li>\n<li data-start=\"344\" data-end=\"418\">\n<p data-start=\"346\" data-end=\"418\"><strong data-start=\"346\" data-end=\"377\">Route Surveying and Studies<\/strong> to ensure project quality and accuracy<\/p>\n<\/li>\n<li data-start=\"419\" data-end=\"529\">\n<p data-start=\"421\" data-end=\"529\"><strong data-start=\"421\" data-end=\"457\">Comprehensive Project Management<\/strong>, including planning, supervision, and assurance of safety and quality<\/p>\n<\/li>\n<\/ul>\n<h3 data-start=\"531\" data-end=\"542\">Summary<\/h3>\n<p data-start=\"544\" data-end=\"890\">Relying on this specialized approach, Ehya Sepahan Iron Ore Mines Company guarantees that power transmission projects are executed with the highest levels of efficiency, sustainability, and compliance with international standards, playing a pivotal role in achieving sustainable development and advancing strategic goals in the mining industry.<\/p>\n<p data-start=\"892\" data-end=\"1177\">Considering that the company&#8217;s mining site currently sources electricity from existing substations in the Sangan mining region, it was decided to construct a transmission line and the required substation completely independently from the Khaf substation (through separate contracts).<\/p>\n<p data-start=\"1179\" data-end=\"1374\" data-is-last-node=\"\" data-is-only-node=\"\">By implementing this project and operating a fully independent 20 kV transmission line, the supply of electricity for factories and support buildings within the mining site will be fully ensured.<\/p>\n","protected":false},"featured_media":1025,"template":"","meta":{"_acf_changed":false},"project-cat":[],"unit_p":[36],"situation_p":[],"class_list":["post-996","project","type-project","status-publish","has-post-thumbnail","hentry","unit_p-development-and-infrastructure-unit"],"acf":[],"_links":{"self":[{"href":"https:\/\/ehyairon.com\/en\/wp-json\/wp\/v2\/project\/996","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ehyairon.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/ehyairon.com\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ehyairon.com\/en\/wp-json\/wp\/v2\/media\/1025"}],"wp:attachment":[{"href":"https:\/\/ehyairon.com\/en\/wp-json\/wp\/v2\/media?parent=996"}],"wp:term":[{"taxonomy":"project-cat","embeddable":true,"href":"https:\/\/ehyairon.com\/en\/wp-json\/wp\/v2\/project-cat?post=996"},{"taxonomy":"unit_p","embeddable":true,"href":"https:\/\/ehyairon.com\/en\/wp-json\/wp\/v2\/unit_p?post=996"},{"taxonomy":"situation_p","embeddable":true,"href":"https:\/\/ehyairon.com\/en\/wp-json\/wp\/v2\/situation_p?post=996"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}